![]() |
||
|
Front Page | Construction | Dome Map | Bird List | Gardening | Inside Pictures | Contact |
||
|
Dome Construction | ||
|
Site Preparations | Foundation Preparations | Preparing Floor and Planting | Building Dome | Releasing the Birds | ||
|
Site Preparation | ||
|
| ||
| Once I mapped out the basic area of the structure, a local contractor came and dug it out. 7 truckloads later and a huge pile of dirt for fill in, it was done. | ||