![]() |
||
|
Front Page | Construction | Dome Map | Bird List | Gardening | Inside Pictures | Contact |
||
|
Dome Construction | ||
|
Site Preparations | Foundation Preparations | Preparing Floor and Planting | Building Dome | Releasing the Birds | ||
|
Site Preparation | ||
|
| ||
| The garage used to be where the dome stands now. It had a dirt floor and needed to be changed anyway. It's been moved to the right of the picture and a proper concrete floor poured. It was moved in sections. The roof and trusses were all removed, the walls was cut into movable sections. Because it was bolted to concrete posts it has to be pulled from the foundation with my jeep. | ||