Dome Construction

 
 

Site Preparations  | Foundation Preparations | Preparing Floor and Planting | Building Dome | Releasing the Birds

 
 

Foundation Preparations

 
 

 
  Form wall ready to be cut in the jig. The two angled boards are for the saw to follow on the outside. One of the greenhouse sill plate 2x6 is placed to ensure the top and bottom of the cut are correct.  
 