![]() |
||
|
Front Page | Construction | Dome Map | Bird List | Gardening | Inside Pictures | Contact |
||
|
Dome Construction | ||
|
Site Preparations | Foundation Preparations | Preparing Floor and Planting | Building Dome | Releasing the Birds | ||
|
Foundation Preparations | ||
|
| ||
| Form wall ready to be cut in the jig. The two angled boards are for the saw to follow on the outside. One of the greenhouse sill plate 2x6 is placed to ensure the top and bottom of the cut are correct. | ||
|
First | Previous | Next | Last Go to Image 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, | ||