| A number of changes from the standard plan was done. Mostly it had to do with making the dome as energy tight as possible. Meaning more insulation and less vunerable areas to exposure. First in this pic is the north plywood wall. This is fully insulated. The join with the panels was done using the U shape plastic ends for the bottom of the panels for the matching between the panels and the plywood then sealing the join with silicon. | ||
|